C&N Industrial Group official site,Shanghai CN industrial, Hebei C&N, Pipe,fitting and flange with expoxy and 3LPE coating

Phone: +86-317-628 7569 E-mail: cnpipefitting@hotmail.com

COMPANY NEWSNews

21x40HQ Container Loading Of Solid wooden Pallet For WTCO SWPC Project

21x40HQ Container Loading Process for Large Size Pipe Fitting:

  1. Wooden Pallet Preparation:
    • The piping components, such as tees, reducers and elbows, are carefully placed on a solid wooden pallet.
    • The wooden pallet provides a sturdy base to support the weight and shape of the piping products.
  2. Container Loading:
    • The loaded wooden pallet is then pushed into the 21×40-foot shipping container.
    • This allows the piping components to be securely contained within the container for transport.
  3. Cargo Securing:
    • Ropes or straps are used to firmly secure the loaded pallet inside the container.
    • This ensures the cargo remains in place during transit and prevents any shifting or damage to the piping products.
  4. Container Closure:
    • Once the cargo is loaded and secured, the container doors are closed and sealed.
    • This protects the contents from environmental factors and ensures the safe delivery of the piping components to their destination.

SR elbows are packed into 21x40HQ container

Equal tees are packed into 21x40HQ container

Pipe Fittings are packed into 21x40HQ container

The use of a wooden pallet as the base, combined with the rope/strap securing method, helps to optimize the loading process and maintain the integrity of the piping products during transportation. This approach helps to minimize any potential damage or shifting of the cargo within the container.

Prev:

Next:

Leave a Reply

Leave a message