C&N SAUDI PROJECT YANBU4 FOR FBE FITTING

SWPC Announces Financial Close of Yanbu-4 Independent Water Plant.

Saudi Water Partnership Company successfully achieved the Financial Close for Yanbu-4 IWP with the participation of success partners from the relevant authorities such as the Supervisory Committee at the Ministry of Environment, Water and Agriculture, developers and consultants.

Yanbu-4 is an Independent Water Plant with capacity of 450 thousand cubic meters per day along with its Water Special Facilities “WSF” (Yanbu-Rayis water transmission pipeline with length of 39 km and capacity of 600 thousand cubic meters per day). The total cost of Project is around 3.3 billion Saudi Riyals, to be built and operated by the private sector for a period of 25 years from the Commercial Operation Date, while the WSF will be transferred to the Saline Water Conversion Corporation after construction. Noting that the winning consortium of the project consists of International Power S.A. (Engie), Mowah Co. CJSC and Nesma Company Limited.

C&N SAUDI PROJECT YANBU4
C&N SAUDI PROJECT YANBU4 SHIPMENTS VIDEO

C&N Industrial Group Limited, as one of the piping supplier supplied fitting and flange from DN500 to DN2400 to YANBU4 project.

these fitting strictly comply SWCC requirements.