RAYIS-RABIGH INDEPENDENT WATER TRANSMISSION PIPELINE (IWTP)

RAYIS-RABIGH INDEPENDENT WATER

TRANSMISSION PIPELINE (IWTP)

JEDDAH SECOND INDUSTRIAL CITY WATER TRANSMISSION SYSTEM

Updated: Decemeber, 2024
Sector Utilities: Industry Distribution Network
Type: Water Distribution Network
Stage: Ongoing

The joint venture of Alkhorayef Water and Power Technologies and Tedagua (EPC JV: Alkhorayef – Tedagua) has recently been awarded with Rayis-Rabigh Independent Water Transmission Pipeline Project (IWTP 02), As WTCO, SWPC,SWCC approved supplier, C&N HEBEI HONGCHENG attend RFQ package Metallic pipe and fittings.

Project Background

The Government has commenced the process of restructuring and developing the water sector in the

Kingdom and placing greater reliance on the private sector to deliver and manage water services.

The SWPC 7-Year Statement (2019-2025) builds on the water policies notably the National Water Strategy

2030 and MEWA’s latest long-term supply demand forecasts. It also factors MEWA directive of providing 90%

of national urban supply by desalinated water to reduce reliance on non-renewable ground sources.

As part of the programme, SWPC intends improve the water supply in Saudi Arabia through private sector

participation. One IWTP project part of this programme is the Rayis-Rabigh IWTP (“The Project”) with length of approx. 151 kms and a Contracted Capacity of 500,000 m³/d. The principal objective for this Project is to transport water from the new tank farm under construction at Rayis and the future desalination plant Rayis 2 IWP located at Rayis to the existing tank farm at Rabigh, part of the Rabigh IWP and related extension.

Furthermore, the Project will allow for transferring water in the opposite direction during Reverse-Flow

Operation from Rabigh to Rayis.

3.2. Project Location

The areas allocated for the main components of the Project are in the area of Rayis in Baha Region and

Rabigh in Makkah region, in the Kingdom of Saudi Arabia. Both areas are located close to the Red Sea shoreline.

The main components of the Project at Rayis are located within an existing complex owned by the Saline

Water Conversion Corporation (SWCC). In the same complex, the Yanbu 4 IWP as well as main components

of the Yanbu-Rayis water transmission system are located (Rayis tank farm and pumping station). The Rayis 2

IWP which will be constructed in future will also be located inside the same complex. It shall be noted that the

Yanbu 4 IWP is also known as Rayis 1 IWP.

The main components at Rabigh are located within an existing SWCC complex, in the close vicinity of the

existing pumping station of the Rabigh-Jeddah-Makkah water transmission system (RBJWTS) and the related

Rabigh tank farm. The existing Rabigh tank farm will be extended as part of the Rabigh-4 IWP project. The

works related to the extension of the existing Rabigh tank farm (PWSF) will be carried out by the project

company of the Rabigh-4 IWP and will be transferred to the DWTSO after commissioning.

The arrangements of all new components shall be done under consideration of the impact on existing and

future structures and components in the vicinity of the Project components.

The mainline for transferring potable water from / to the start and end points at Rayis and Rabigh with a

total length of approximately 151 kms shall mainly follow highway M55.

3.3. Project Overview

The intention of the Rayis-Rabigh Independent Water Transmission Pipeline is to transport water from Rayis to Rabigh and vice-versa in case of Reverse-Flow Operation.

During Normal Operation, the water supply for the Facility will be from the Rayis tank farm and the new

Rayis 2 IWP desalination plant which is going to be constructed in parallel with the Facility. The Facility shall allow for the possibility to transport water from the storage tanks of the Rayis tank farm and the storage tanks of this new Rayis 2 IWP to the existing Rabigh tank farm and its extension.

Additionally, the Facility shall allow for Reverse-Flow Operation. In case of Reverse-Flow Operation, water

shall be supplied from the existing Rabigh-Jeddah-Makkah water transmission system (RJMWTS), using the same main pipeline.

The Facility comprises of the following major components:

IWTP including pipelines, related pumping station and all other equipment and systems required for

transferring water from Rayis to Rabigh and vice-versa with a Contracted Capacity of 500,000 m³/d.

Rayis Water Special Facility including regulating tanks (2 x 170,000 m³), connecting pipelines, and all

other equipment and systems required for transferring 300,000 m³/d of water from the new Rayis 2 IWP

and maximum 500,000 m³/d of water from the Rayis tank farm to the IWTP. Additionally, all connection

pipelines and all other equipment and systems required to transfer 500,000 m³/d from the IWTP to the

Rayis tank farm via the Rayis Water Special Facility regulating tanks.

About us

C&N HEBEI Hongcheng (SWCC,NWC,WETCO,PDO,API) specializes in the production of high-performance alloy, stainless steel and carbon steel products to meet the strict requirements of oil and gas, petrochemical, construction, energy and other industries. With superior quality and a commitment to excellence, our products – from alloy steel pipe and flanges to precision engineered fittings – are manufactured in challenging environments to provide superior durability, corrosion resistance and operational reliability.

Msg

In order to show our sincerity and warm welcome to international companies, our company sincerely invites international companies interested in our company’s products to visit our factory.

Contact us today to reach an early cooperation!

Prev:

Next:

Leave a Reply

Leave a message