C&N Industrial Group official site, Pipe,fitting and flange with expoxy and 3LPE coating
Phone: +86-317-628 7569 E-mail: cnpipefitting@hotmail.com

PROJECT

C&N SAUDI PROJECT RABIGH 4 IWP FOR PIPE FITTING

OVERVIEW

The Rabigh 4 IWP Project with a capacity of 600,000 m3/ day SWRO desalination plant and the PWSF tank 1,200,000 m3 and the PV capacity of 6.804 MWp, and the location is next to our existing Rabigh 3 IWP Plant The project is consortium of ACWA Power owned 45%, Haji Ali Reza (HAACO) 35% and Al Moayyed 20%, and is scheduled to be commissioned by 31 March 2026. 

KEY FACTS

LOCATIONSaudi Arabia
DESALINATED WATER (‘000 m3/day)600,000 m3/day + 1,200,000 m3 PWSF Tank Facility
CONFIGURATIONConventional
PROJECT COSTUSD675 Mn
ACWA POWER SHARE45%
OFFTAKE CONTRACTWPA–BOO–25 YR
COMMERCIAL OPERATIONAL DATEQ1 2026
PROJECT COMPANYRawabi Water Desalination Company

C&N is proud working with POWERCHINA as sub EPC contractor , We supplied over 3000tons pipe,fitting with coating and lining to RABIGH4 project, POWERCHINA is the world’s largest desalination EPC (Engineering, Procurement, and Construction) general contractor, now we are working with powerchina branch company SEPCOIII, and WETICO on the Rabigh 4 Independent Water Plant (IWP) in Saudi Arabia. The total project cost of the SR 2.54 billion (US$677 million) .


Prev:

Next:

Leave a Reply

Leave a message